Vega moves closer to its first liftoff

Hoisting of Zefiro-23
Hoisting of Zefiro-23
Vega moves closer to its first liftoff The integration of Vega's first, second and third stages is now complete at Europe's Spaceport in French Guiana. The new rocket is moving full speed ahead towards its maiden flight at the end of January. The first Vega launch campaign began in November with the installation and testing inside the mobile gantry of the hundred-tonne solid-propellant first stage, the P80, and the Interstage-1/2 structure that links the first two stages. The booster's final acceptance included testing of the thrust vector control system. The large nozzle was swivelled to simulate different flight profiles. Electrical and avionics interface and functional tests were also performed. The next step was to move the 30-tonne solid-propellant second stage, the Zefiro-23, from the Vega Booster Storage and Preparation Building, to the pad. As with the P80, the second stage underwent final acceptance, including testing of its thrust vector control system. Finally, the 10-tonne Zefiro-9 solid-propellant third stage was added on top of the launcher last week, marking another milestone of the campaign. Electrical and functional tests are now underway. The second and last Flight Readiness Review, held on 7 December, gave the go-ahead for the final preparation and launch. In the coming days, the AVUM - Attitude &Vernier Upper Module - liquid-propellant fourth stage will be moved to the pad and added to the launcher. Final preparations for launch in January
account creation

TO READ THIS ARTICLE, CREATE YOUR ACCOUNT

And extend your reading, free of charge and with no commitment.



Your Benefits

  • Access to all content
  • Receive newsmails for news and jobs
  • Post ads

myScience